Plour project is in a villa building located on a land with an area of five thousand meters at the foot of Damavand peak and Plour area.
In addition to the special and natural landscape of this building, the different and unique design of this villa, which was executed by Mr. Abir, one of the pioneers of Iranian architecture, at the request of the esteemed employer, Mr. Varzandeh, who is also one of the people with a long history in They have building architecture and civil engineering, and they built this villa for their own personal use.
One of the special features of this building is its architectural style, which is inspired by pre-Islamic Iranian architecture, and at the same time, its soul-pleasing simplicity, the use of pavilion, earring and arch forms can be seen in it.
Wade’s place is located on the third floor of the building, on top of which a glass roof was already created to allow natural light into the space, and Wade himself, which is in the form of a pavilion, was created on the third floor, which is used for games and sports halls. And it’s fun, and what makes this project unique is that people are in close contact with Wade himself.
Prior to our entry into the project, this structure was created by the employer with a special but complex geometry with a square cross-section of Figure 5 with dimensions * 5 and a height of 2.5 meters, which has the shape of an earring or pavilion, ie assuming a hole whose sections are bent. To be.
The design of this work was repeated many times with Mr. Abir Etadeh and several sessions were put in place so that the design and arrangement of stein glass would finally have a suitable structure with the structure and the whole building. Offset given inside. And the color scheme of the work was chosen using the concept of nature, in the lower part of the cold blue and green colors until we reach the upper part of the warm red and yellow colors of the sun’s rays. And after the approval of the plan by the employer, the construction and installation of the work took about 2 months, and after the installation of the work, considering that Wade had worked inside the building and did not need sealing, but due to protection and cleaning issues and with Due to the fact that people were in direct contact with the work, sealing protective layers were also installed on this work.
And proudly this was one of the special projects done by the Archi Taj group.